I went out to check the holes on the
morning the posts were to go in.
I found that lots of little critters had
fallen in the holes, including this turtle.
Don't worry....no animals were injured during the Green Building Adventure.
Each post was cemented into
place with 3 bags of cement.
These posts aren't going anywhere!
Notice the braces still on the posts.
They were removed once the cement set.
Check out our posts!
They are all square and straight
and are cemented into place.
This is a very, very important
step in the construction process.
If the posts are crooked,
your building will also probably
be crooked.
David went back to the marks
he made with the surveyor's level.
He cut the posts to the proper
height and then cut a notch.
This notch will hold
the floor.
Matthew adds bridging to the
floor joists. These are short
pieces of wood that are nailed
between each joist to make
sure the joists don't
move or warp.